Case Studies

Professional Engineering Consultants
February 21, 2025
Kehoe Myers were engaged by Lexus Toowoomba to provide comprehensive Civil, Structural, and Hydraulic engineering services for their prestigious showroom. This multi-storey complex embodies sophistication, boasting a 1000m² basement area, a podium level adorned with customer parks and an outdoor display area, and an upper-level showroom complete with sales offices, a reception area, a welcoming foyer, and essential amenities. Designed with contemporary flair, the building utilises lightweight materials and low-energy glass to mitigate solar heat gain, ensuring both elegance and sustainability. Our Civil Engineering services encompassed a spectrum of site works, including driveway crossovers, vehicular access zones, and meticulously planned parking facilities. Additionally, our team addressed critical aspects such as site drainage, stormwater management, and erosion and sediment control, ensuring seamless integration with the surrounding environment. Our Hydraulic Engineering team focused on optimal functionality and efficiency. We completed the detailed design for fire water supply, domestic water supply, sanitary plumbing, and roof water drainage, prioritising safety and operational reliability. The Structural Design demanded attention to detail to support the architectural vision. Our team carefully calculated detailed footings to support load-bearing walls and the suspended concrete floor. From reinforced concrete columns to ground floor slabs, and from the innovative suspended concrete floor structure to the precision-engineered structural steel wall and roof framing, every element was crafted with precision and excellence in mind. We've not only delivered a state-of-the-art showroom but also contributed to the elevation of architectural standards and engineering ingenuity. It's a testament to our commitment to excellence and innovation in every facet of our work.
February 21, 2025
Adding to our portfolio of sports stadiums, we proudly present the Toowoomba Grammar School (TGS) Stadium, a beacon of sporting excellence that officially opened its doors in September 2018. This architectural marvel boasts two expansive basketball courts above a cavernous open space housing five indoor cricket pitches. Elevated spectator seating, classrooms, and staff rooms adorn the upper level, providing a panoramic view of the sporting action below. The Civil and Structural Engineering undertakings for the TGS Stadium were nothing short of intricate. Carving out the lower level, we excavated a staggering 10 meters into the existing oval, presenting a unique challenge that demanded innovative solutions. Our team engineered a retaining wall that stood independent of the building, employing slip joints to accommodate movement without compromising structural integrity. Careful consideration was given to seamlessly link the new retaining structure with existing walls, ensuring a harmonious integration. The structural engineering feats of the building were equally complex. Opting for large-span composite beams, we created a robust framework that allowed for the expansive open space required for the cricket pitches, all while providing support for the basketball courts above. Precision was paramount as we meticulously calculated deflection for the specialised sports flooring, ensuring optimal performance on the courts. Collaborating with specialist contractors, the sports flooring was laid using over 10,000 packers to achieve flawless floor leveling. Navigating site constraints with vigor, our team embraced challenges with enthusiasm, seamlessly integrating functional modern spaces while preserving the timeless character of TGS, thanks to the masterful work of Wilson Architects. From the St. Ursula’s College Salo Centre to the Glennie School Sports Stadium, our legacy of excellence in sports infrastructure endures, paving the way for future generations of athletes to thrive.
October 16, 2024
Kehoe Myers added to its portfolio of Sports Stadiums with the opening of The Glennie School’s Clive Berghofer Sports Centre in May 2019. The Sports Centre is a three court indoor centre, adjoining the Glennie School’s existing aquatic facility. The space has a floor area of more than 3,500 m2 and includes reception, café, office, first aid room, amenities and multi-purpose courts with perimeter seating. The Centre also has undercroft car parking and storage. The Centre was constructed with large-span steel roof trusses, and suspended post tension concrete floor. The Architects, Burling Brown, ensured the building complemented the existing Glennie School aesthetics. This $8 million Centre is one of a number of projects Kehoe Myers has completed at Glennie School. Our team were also involved in the Science Centre, Theatre Room, and multiple car parking projects just to name a few.  The Clive Berghofer Sports Centre is a wonderful addition to the Glennie School’s first-class sporting facilities catering for all their student’s sporting ambitions.
Share by: