Soldiers Memorial Hall Toowoomba
The Toowoomba Soldiers Memorial Hall, a cherished heritage-listed landmark situated at the intersection of Ruthven Street and Herries Street, stands as a tribute to the valiant soldiers of World War I, whose sacrifices resonate within its hallowed halls. Erected in three phases spanning from 1923 to 1959, this architectural marvel serves as a testament to collective memory and historical legacy.
Our involvement commenced with phase 1, focusing on project definition & schematic design. Undertaking a comprehensive initial inspection, we conducted a high-level assessment of the building's engineering elements, identifying key issues, constraints, and opportunities. Collaborating closely with external consultants, including Soil Surveys and Minstaff Survey, we embarked on a thorough engineering assessment, utilising cutting-edge non-destructive concrete scanning to evaluate the suspended slab's capacity without invasive testing. Our contributions to the master program and feasibility studies facilitated informed decision-making, laying the groundwork for subsequent phases.
Transitioning into Phase 2, Detailed Design, our team delved into the intricacies of design and documentation, meticulously crafting solutions that balanced heritage preservation with contemporary compliance requirements. Working hand in hand with Aspect Architects, we navigated challenges such as upgrading downpipes while preserving the hall's heritage façade, ensuring seamless integration of engineering services. Leveraging our multidisciplinary expertise, we managed Civil, Structural, and Hydraulic aspects, collaborating with subconsultants for Electrical and Mechanic Engineering services to deliver comprehensive solutions. Innovative approaches, such as incorporating carbon fibre reinforcement to enhance the suspended slab's capacity, underscored our commitment to sustainable and efficient design practices.
Phase 3, Construction, witnessed the realisation of our collective vision as we partnered with contractors and project teams to oversee the implementation of design solutions. Conducting routine inspections, resolving site constraints, and ensuring compliance with safety standards were paramount as we navigated the complexities of on-site construction.
Our collaboration with the Toowoomba Regional Council on this iconic project was a privilege, reflecting our shared dedication to preserving our region's heritage and cultural legacy.